.

Construction of DWDM network is completed on the route  Chernivtsi-Ivano-Frankivsk-Uzhgorod

Eurotranstelecom has completed the construction of the DWDM network in the Chernivtsi-Ivano-Frankivsk-Uzhgorod direction and the modernization of the Lviv-Uzhgorod line. DWDM equipment is ready for optical fiber bandwidth speed at 10/40/100 / 200Gbps each. For control and configuration flexibility optical cross-switches are installed at the node points.