Last week technical department Eurotranstelecom LLC completed the organization of the second channel 100G on a single optical wave length at the station Kyiv-Donetsk.
Channel arranged without signal regeneration throughout the area length of 940 km. Total capacitance at the Donetsk exceed 250 Gbit/s!